|| || ||<5 % style=""> ||<5 % style=""> ||<2 0 % style=""> ||<2 0 % style=""> ||<2 0 % style=""> || || Detailed scheduling and planning || MR ||<bgcolor="#8080ff"> || || No detailed schedule / plan available. || || || || Contact users and line-up interviews || MR ||<bgcolor="#8080ff"> || ||Interviewed 1 Classics user. Mustie has tried to contact another user from Classics, and to find other users he has contacted the DIAMM project and the BRIDGES project. No response yet. || || || || Analysis of IB usability feedback || MR ||<bgcolor="#8080ff"> ||<bgcolor="#8080ff"> ||Mustie to arrange a meeting with Matthew Mascord to dicsover if there is any data / users available.|| || || || Analysis of BVREH usability feedback || MR, AE || ||<bgcolor="#8080ff"> ||Mustie is not convinced that BVREH usability feedback is available.|| || || || Interviewing of selected IB users || MR, AE || ||<bgcolor="#8080ff"> || ||tbc|| || || Interviewing of selected BVREH users || MR, AE || ||<bgcolor="#8080ff"> ||<bgcolor="#8080ff"> ||tbc|| || || 'Lab' usability tests of BRIDGES || MR, AE || || ||<bgcolor="#8080ff">No response to Mustie's emails.||<bgcolor="#8080ff">tbc|| || || Analysis of usability tests[[FootNote(Including reaction to failure)]] || MR, AE || || ||<bgcolor="#8080ff"> ||<bgcolor="#8080ff"> || || || Report writing || MR, MN || || || ||<bgcolor="#8080ff"> ||<bgcolor="#8080ff"> || || Final report || MR, MN || || || || ||<bgcolor="#8080ff"> || |
|| || ||<style="width: 5%;"> ||<style="width: 5%;"> ||<style="width: 20%;"> ||<style="width: 20%;"> ||<style="width: 20%;"> || || Detailed scheduling and planning || MR ||<#8080FF> || || No detailed schedule plan available. || || || || Contact users and line-up interviews || MR ||<#8080FF> || || Via Ruth Mustie has contacted and interviewed 1 Classics user. (1 other to be contacted). Emails to the DIAMM project and the BRIDGES project have not been answered. || || || || Analysis of IB usability feedback || MR ||<#8080FF> ||<#8080FF> || Mustie to arrange meeting with Matthew Mascord to discover if any data / users available? || tbc || || || Analysis of BVREH usability feedback || MR, AE || ||<#8080FF> ||Mustie is not convinced data available. || tbc || || || Interviewing of selected IB users || MR, AE || ||<#8080FF> || ||tba || || || Interviewing of selected BVREH users || MR, AE || ||<#8080FF> ||<#8080FF> ||tbc || || || 'Lab' usability tests of BRIDGES || MR, AE || || ||<#8080FF> tba ||<#8080FF> tba || || || Analysis of usability tests[[FootNote(Including reaction to failure)]] || MR, AE || || ||<#8080FF> ||<#8080FF> || || || Report writing || MR, MN || || || ||<#8080FF> ||<#8080FF> || || Final report || MR, MN || || || || ||<#8080FF> || |
Line 22: | Line 23: |
Line 24: | Line 26: |
. http://pioneer.nesc.gla.ac.uk/gridsphere |
http://pioneer.nesc.gla.ac.uk/gridsphere |
Project meeting
Alun and Mustie met at OUCS on 16th Nov 2006
Work packages
We agreed that because of illnesses and other project commitments the work packages now look more like this.
Task/work package |
Leaders |
Sept |
Oct |
Nov |
Dec |
Jan |
|
|
|
|
|
|
|
Detailed scheduling and planning |
MR |
|
|
No detailed schedule plan available. |
|
|
Contact users and line-up interviews |
MR |
|
|
Via Ruth Mustie has contacted and interviewed 1 Classics user. (1 other to be contacted). Emails to the DIAMM project and the BRIDGES project have not been answered. |
|
|
Analysis of IB usability feedback |
MR |
|
|
Mustie to arrange meeting with Matthew Mascord to discover if any data / users available? |
tbc |
|
Analysis of BVREH usability feedback |
MR, AE |
|
|
Mustie is not convinced data available. |
tbc |
|
Interviewing of selected IB users |
MR, AE |
|
|
|
tba |
|
Interviewing of selected BVREH users |
MR, AE |
|
|
|
tbc |
|
'Lab' usability tests of BRIDGES |
MR, AE |
|
|
tba |
tba |
|
Analysis of usability testsFootNote(Including reaction to failure) |
MR, AE |
|
|
|
|
|
Report writing |
MR, MN |
|
|
|
|
|
Final report |
MR, MN |
|
|
|
|
|
Test-drive the demonstration
Connect to the Gridsphere portal