Line 16: | Line 16: |
["BID Scenarious Analysis"] | ["BID Scenario Analysis"] |
Tasks
Shibb-ing ASK
Owner: Colin Tatham
Oct 07 Workshop
["BID_Oct_07_Workshop"]
Requirements analysis
Owner: Howard Noble
Technical analysis of repository scenarios
The JISC Repository Programme community produced a comprehensive list of repository-type scenarios. We will use these to shape discussion about how the BID infrastructure will provide services that match these 'requirements' statements.
["BID Scenario Analysis"]
Prototyping the ASK system
The ASK system will be maintained for the duration of the BID project to demonstrate interoperability and repository services to end-users. Through this demonstration requirements will be documented for the final BID implementation
["BID Prototyping"]