Differences between revisions 7 and 8
Revision 7 as of 2007-09-18 14:17:18
Size: 798
Editor: HowardNoble
Comment:
Revision 8 as of 2013-05-20 11:29:49
Size: 798
Editor: localhost
Comment: converted to 1.6 markup
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
[[TableOfContents([2])]] <<TableOfContents([2])>>
Line 8: Line 8:
["BID_Oct_07_Workshop"] [[BID_Oct_07_Workshop]]
Line 16: Line 16:
["BID Scenario Analysis"] [[BID_Scenario_Analysis]]
Line 21: Line 21:
["BID Prototyping"] [[BID Prototyping]]

<<TableOfContents: execution failed [Argument "maxdepth" must be an integer value, not "[2]"] (see also the log)>>

Tasks

Shibb-ing ASK

Owner: Colin Tatham

Oct 07 Workshop

BID_Oct_07_Workshop

Requirements analysis

Owner: Howard Noble

Technical analysis of repository scenarios

The JISC Repository Programme community produced a comprehensive list of repository-type scenarios. We will use these to shape discussion about how the BID infrastructure will provide services that match these 'requirements' statements.

BID_Scenario_Analysis

Prototyping the ASK system

The ASK system will be maintained for the duration of the BID project to demonstrate interoperability and repository services to end-users. Through this demonstration requirements will be documented for the final BID implementation

BID Prototyping