Below is a list of known tasks. This project plan (like all plans) will be revised on a continuous basis.
Line 5: Line 3:
= June =
 * Daniel, Kang and Howard to agree design of monitoring service and agree completion date
 * Kate to submit bIT campaign plan
 * Kang, Howard and Lisa to discuss WOL at Liverpool
 * Kang, Howard and Adrian to present at ITSS conference
 * Robert to set up OUCS gateway using mini-ITX hardware
= July =
 * Kang, Howard, Adrian and Robert to finish all tasks relating to distribution of WOL code (see suggestions from Dominic and Oxcert)
 * Re-design project website to encompass ideas from bIT campaign plan
 * Write up case studies for different commercial tools e.g. description of how they work in a specific setting and anything vendors want to say about costs.
 * Work out how to create a toolbox e.g. all the tools that can be used, how to categorise them, and how to shortlist all the tools e.g. must have a named advocate in the UK HE/FE
= August =
= September =
= October =
= November =
= December =
= WOL service at Liverpool =
This work task is focused on setting up a WOL service at Liverpool University using the software developed at Oxford.

Ideally the solution will be built in a way that it can be given to a hosting service (such as Janet) who can then offer the service nationally.As such Shibboleth is key.

 * Design document
 * Give gateway software to Liverpool (NB Windows site license)
 * Sort out distribution of all code and documentation as per suggestions from Dominic and David F
= Monitoring service =
 * Enhancements to the manage interface
 * Configure manage interface at OeRC, OUCS and OUCE
 * New graph that shows % of total nodes found throughout the day and night
 * Get support from colleges and departments
 * Get agreement from OUCS to host the service
 * Change permissions structure so the graph can be public
= Campaign =
 * Develop model library and guide
 * Get more sites using the service, especially colleges
 * ITSS conference
 * Tool box including commercial solutions
 * Do your bIT logo
= Staff =
Below we list the deliverables for each member of staff:
== Daniel ==
 *
== Howard ==
== Ken ==
== Kang ==
== Robert ==
== Lisa ==
== John ==
== Pete ==
= Ideas =
 * Oxford-only poll
 * Howard to set up bIT prediction market: http://markets.nitle.org/
 * Write up groupware case study with Mark N
 * Write up procurement advice with Maria C
 * Copy security review process for green IT e.g. survey that asks for self assessment on key issues

TableOfContents([2])

WOL service at Liverpool

This work task is focused on setting up a WOL service at Liverpool University using the software developed at Oxford.

Ideally the solution will be built in a way that it can be given to a hosting service (such as Janet) who can then offer the service nationally.As such Shibboleth is key.

  • Design document
  • Give gateway software to Liverpool (NB Windows site license)
  • Sort out distribution of all code and documentation as per suggestions from Dominic and David F

Monitoring service

  • Enhancements to the manage interface
  • Configure manage interface at OeRC, OUCS and OUCE
  • New graph that shows % of total nodes found throughout the day and night
  • Get support from colleges and departments
  • Get agreement from OUCS to host the service
  • Change permissions structure so the graph can be public

Campaign

  • Develop model library and guide
  • Get more sites using the service, especially colleges
  • ITSS conference
  • Tool box including commercial solutions
  • Do your bIT logo

Staff

Below we list the deliverables for each member of staff:

Daniel

Howard

Ken

Kang

Robert

Lisa

John

Pete

Ideas

  • Oxford-only poll
  • Howard to set up bIT prediction market: http://markets.nitle.org/

  • Write up groupware case study with Mark N
  • Write up procurement advice with Maria C
  • Copy security review process for green IT e.g. survey that asks for self assessment on key issues