Differences between revisions 7 and 8
Revision 7 as of 2009-06-29 10:12:44
Size: 1477
Editor: HowardNoble
Comment:
Revision 8 as of 2009-06-29 10:14:07
Size: 1550
Editor: HowardNoble
Comment:
Deletions are marked like this. Additions are marked like this.
Line 25: Line 25:
Below we list the deliverables for each member of staff:
Line 26: Line 27:
 *
Line 27: Line 29:
== Ken ==

TableOfContents([2])

WOL service at Liverpool

This work task is focused on setting up a WOL service at Liverpool University using the software developed at Oxford.

Ideally the solution will be built in a way that it can be given to a hosting service (such as Janet) who can then offer the service nationally.As such Shibboleth is key.

  • Design document
  • Give gateway software to Liverpool (NB Windows site license)
  • Sort out distribution of all code and documentation as per suggestions from Dominic and David F

Monitoring service

  • Enhancements to the manage interface
  • Configure manage interface at OeRC, OUCS and OUCE
  • New graph that shows % of total nodes found throughout the day and night
  • Get support from colleges and departments
  • Get agreement from OUCS to host the service
  • Change permissions structure so the graph can be public

Campaign

  • Develop model library and guide
  • Get more sites using the service, especially colleges
  • ITSS conference
  • Tool box including commercial solutions
  • Do your bIT logo

Staff

Below we list the deliverables for each member of staff:

Daniel

Howard

Ken

Kang

Robert

Lisa

John

Pete

Ideas

  • Oxford-only poll
  • Howard to set up bIT prediction market: http://markets.nitle.org/

  • Write up groupware case study with Mark N
  • Write up procurement advice with Maria C
  • Copy security review process for green IT e.g. survey that asks for self assessment on key issues